system center

Results 176 - 200 of 258Sort Results By: Published Date | Title | Company Name
Published By: HP     Published Date: Jul 22, 2014
In this ESG white paper, the capabilities and common characteristics of flash implementations are categorized as “bronze”-, “silver”-, and “gold”-type approaches, depending on the degree to which they enable fully featured storage systems. It evaluates how HP’s storage delivers the basics and follows with a series of flash-specific optimizations and advances that we’ll call “gold standard” flash capabilities, after which it hints at HP’s vision of the future for their flash storage architecture. Throughout the paper, the importance of both IT architecture and business implications is emphasized.
Tags : 
tier-1, storage, data, flash, storage system, data center
    
HP
Published By: Pivot3     Published Date: Nov 01, 2017
I&O leaders desire more workload scaling from HCIS, but need more convincing. This Gartner research provides insight and guidance on adoption of this technology and its potential to handle more challenging workloads.
Tags : 
hyperconverged integrated systems, infrastructure systems, enterprise workloads, data center, hybrid cloud
    
Pivot3
Published By: Eaton     Published Date: Jan 26, 2016
When working with data center and commercial facility electrical systems, shocks of 100mA to more than 2,000mA are possible—definitely in the realm of serious harm to humans and property. Energized electrical equipment also presents the risk of arc flash caused by electrical faults that produce powerful explosions. When dealing with commercial and industrial electrical systems, such as uninterruptible power systems (UPSs) and their batteries, data center and facilities managers need to be aware of these risks, especially since some repair and maintenance procedures require working with a unit that is still energized. There are ways to minimize the risks to employees, equipment and the field technician performing the service. This paper answers some common questions about UPS maintenance, how to reduce the risks associated with servicing UPSs and batteries, and how to qualify a UPS service provider.
Tags : 
eaton, ups safety, data center, arc flash, energized electrical equipment, facility managers, ups maintenance
    
Eaton
Published By: Eaton     Published Date: Mar 07, 2016
In their search for top-of-the-class uninterruptible power systems (UPSs) for their demanding data center environment, WUSD wanted a system that would keep everything backed up with enough runtime for a graceful shutdown, but was also easily scalable. Equally important, the district wanted seamless integration with their virtual environment. Find out how the Eaton 9390 UPS and the Eaton Intelligent Power Software (IPS) Suite made the grade.
Tags : 
upss, uninterruptible power systems, data center environment, backup, shutdown, scalability, integration
    
Eaton
Published By: IBM     Published Date: Sep 16, 2014
In 2013, Bon Ton Stores invested in upgrading IT, continuing to update and expand its eCommerce sites, and launching a new mobile site supporting delivery of promotions and online purchasing. A central aspect of this technology upgrade involved the replacement of an x86 server environment, supporting eCommerce with ten IBM® PowerLinux™ 7R2 servers and IBM PowerVM® running IBM WebSphere® Commerce on SUSE Linux operating systems. This case study highlights of some of the key aspects of this significant migration and its results, including how Bon-Ton IT executives support the business and what they prioritize, why they decided to make this move, what performance and capability resulted, and how it affected full data center costs and business resilience.
Tags : 
stack costs, online purchasing, promotion delivery, mobile retail
    
IBM
Published By: Intel     Published Date: Apr 16, 2012
Read how blades are the best infrastructure choice for an extremely wide range of enterprise applications and use cases.
Tags : 
intel, storage, 2.0, infrastructure, trends, storage, flexibility, drivers, market dynamics, trends, converged, custom requirement, deduplication, tiering, protocol, foundation
    
Intel
Published By: Cisco     Published Date: Jul 11, 2016
If you need to deploy and scale applications faster to increase revenue, Cisco’s integrated infrastructure solutions can help you achieve your goals—and reduce risk. Technology transitions—such as cloud, mobility, big data, and the Internet of Things—bring together people, processes, data, and things to make resources and connections more valuable to your business. They also challenge the role of IT in the enterprise. For your IT department to stay relevant to your lines of business, it must deliver value faster and invest in innovation. Cisco Unified Computing System™ (Cisco UCS®) integrated infrastructure makes it possible to deliver Fast IT—a new IT model that transforms your data center infrastructure into an environment that is fast, agile, smart, and secure. You can break down the IT barriers that are holding your business back and create solutions that capture the value of new connections and information.
Tags : 
    
Cisco
Published By: Cisco     Published Date: Jul 11, 2016
CTOs, CIOs, and application architects need access to datacenter facilities capable of handling the broad range of content serving, Big Data/analytics, and archiving functions associated with the systems of engagement and insight that they depend upon to better service customers and enhance business outcomes. They need to enhance their existing datacenters, they need to accelerate the building of new datacenters in new geographies, and they need to take greater advantage of advanced, sophisticated datacenters designed, built, and operated by service providers. IDC terms this business and datacenter transformation the shift to the 3rd Platform.
Tags : 
    
Cisco
Published By: CrownPeak     Published Date: Jun 30, 2009
Congratulations you've decided to embark on the journey to implement a content management system (CMS) for your Web site. This document assumes that you have already built the business case for purchasing a CMS and has been signed off on by the appropriate stakeholders. Learn more today!
Tags : 
crownpeak, cms, content management system, web site development, infocenter, hosted services, open source software, project definition, rfp, request for proposal, vendor strengths, os/ databases, hardware, infrastructure, document management, portal, licensing, workflow management, enterprise integration, enterprise application
    
CrownPeak
Published By: CrownPeak     Published Date: Jun 30, 2009
This is the second of a three part CrownPeak White Paper exploring Why Content Marketing Is Online Marketing. In this series we present the new idea that Web content marketing is the central and most important tenet of online marketing. Today, the function of online marketing revolves around the Web which, itself, revolves around content. So as we talk about online marketing/marketers and content marketing/marketers consider them and yourself one and the same. Learn more today!
Tags : 
crownpeak, roi, web content marketing, cms, content management system, web site development, infocenter, hosted services, open source software, project definition, rfp, request for proposal, vendor strengths, os/ databases, hardware, infrastructure, document management, portal, licensing, workflow management
    
CrownPeak
Published By: Eaton Corp.     Published Date: Jun 01, 2009
Virtualization can deliver dramatic benefits for data centers, but it can also stress the underlying support infrastructure.  Power and cooling systems—which may have been quite sufficient for pre-virtualization needs—could easily become inadequate when data center performance patterns are radically altered.  This paper describes some of power challenges related to virtualization—and the readily available technologies to address them.
Tags : 
virtualization, data center, infrastructure management, power, cooling, monitoring.
    
Eaton Corp.
Published By: Eaton Corp.     Published Date: Jun 01, 2009
If IT and Facilities could work collaboratively, organizations can operate more efficiently and effectively while still meeting their business objectives.  That's why Eaton® is partnering with organizations that develop IT management systems to create an integrated approach to energy management.  This white paper describes how a joint monitoring and management solution links IT assets, the data center infrastructure and Facilities assets into a holistic perspective aligned with business processes.
Tags : 
white paper, facilities, collaborate, single pane, joint monitoring, management solution, it assets, data center. solutions
    
Eaton Corp.
Published By: SAS     Published Date: Jan 04, 2019
As the pace of business continues to accelerate, forward-looking organizations are beginning to realize that it is not enough to analyze their data; they must also take action on it. To do this, more businesses are beginning to systematically operationalize their analytics as part of a business process. Operationalizing and embedding analytics is about integrating actionable insights into systems and business processes used to make decisions. These systems might be automated or provide manual, actionable insights. Analytics are currently being embedded into dashboards, applications, devices, systems, and databases. Examples run from simple to complex and organizations are at different stages of operational deployment. Newer examples of operational analytics include support for logistics, customer call centers, fraud detection, and recommendation engines to name just a few. Embedding analytics is certainly not new but has been gaining more attention recently as data volumes and the freq
Tags : 
    
SAS
Published By: IBM     Published Date: Oct 19, 2011
This white paper investigates how Microsoft System Center Virtual Machine Manager helps to reduce problems and increase the benefits of virtualization
Tags : 
smbs, virtualization, system x, data center, microsoft, infrastructure, servers, centralize, virtual, enviornment
    
IBM
Published By: IBM     Published Date: Sep 27, 2013
Cabot Partners offers a glimpse into the market trends for SAP adoption in midsize businesses and imperatives for the supporting platform. A case is made for a simpler virtualized solution, designed for easy installation and operation and cost-effective scaling for growth.
Tags : 
cabot partners, ibm powerlinux, sap, small and medium businesses, smb, sap system landscape, virtualization, linux, powerlinux, powervm, storage, data center
    
IBM
Published By: IBM     Published Date: Sep 27, 2013
Discusses why converged systems, such as IBM PureSystems platforms, can radically simplify the IT life cycle and how these changes can deliver business value by accelerating time to market, improving application performance, and reducing required staff time.
Tags : 
ibm, idc, ibm puresystems, it life cycle, application development, application performance, converged systems, it solutions, datacenter
    
IBM
Published By: IBM     Published Date: Oct 01, 2013
Continual and timely upgrades of UNIX systems can enable growth and lower costs. But for some Sun/Oracle and HP customers, expected upgrade plans have hit major hurdles. Read this Clipper Group white paper to see how only IBM continues to provide a plan, and a predictable drumbeat, for the future. Read it now.
Tags : 
ibm, ibm power7, ibm power7 systems, data center, it infastructure, data center, enterprise applications, consolidation, virtualization, smart computing, platforms
    
IBM
Published By: Oracle     Published Date: Nov 13, 2013
Today’s consumers expect better service, better products, and better communication with retailers. Without a single view of the customer across all channels – including social media – retailers risk alienating customers and driving them to other brands. To meet these challenges, many retailers are deploying software-as-a-service (SaaS) contact center systems that address these problems and create new opportunities. This eBook follows one shopper’s journey and how the concept of the contact center of the future provides the better overall experience.
Tags : 
zenithoptimedia, oracle, smarter service, contact center, lowest tco, cloud-based contact center, contact-center solutions, oracle rightnow solutions, cloud service platform, social media, risk alienating customers, saas, customer experience, brand is customers, it complexity, service improvements
    
Oracle
Published By: IBM     Published Date: Jan 09, 2014
IBM Flex System is quite simply the best blade offering on the market. The rest of this document explains briefly how and why IBM Flex System outperforms mere blade systems IBM Flex. It illustrates the combination of capabilities that Flex System solutions offer and blade systems from HP, Dell, Cisco and, yes, even IBM BladeCenter®, can’t.
Tags : 
ibm, flex system, architecture, blade architecture, puresystems, pureflex, virtualization
    
IBM
Published By: Cisco     Published Date: Apr 10, 2015
Interest in cloud computing over the last several years has been phenomenal. For cloud providers, public or private, it will transform business and operational processes, streamlining customer on-ramping and time to market, facilitating innovation, providing cost efficiencies, and enabling the ability to scale resources on demand. Cisco's Virtualized Multi-tenant Data Center (VMDC) system defines an end-to-end architecture, which an organization may reference for the migration or build out of virtualized, multi-tenant data centers for new cloud-based service models such as Infrastructure as a Service (IaaS).
Tags : 
cisco, design, network architecture, mobile devices, best practices, vmdc, data center, cloud computing, iaas
    
Cisco
Published By: Cisco     Published Date: Sep 16, 2015
Cisco's Virtualized Multi-tenant Data Center (VMDC) system defines an end-to-end architecture, which an organization may reference for the migration or build out of virtualized, multi-tenant data centers for new cloud-based service models such as Infrastructure as a Service (IaaS).
Tags : 
applications, systems integration, cloud, development
    
Cisco
Published By: Cisco     Published Date: Dec 21, 2016
CTOs, CIOs, and application architects need access to datacenter facilities capable of handling the broad range of content serving, Big Data/analytics, and archiving functions associated with the systems of engagement and insight that they depend upon to better service customers and enhance business outcomes. They need to enhance their existing datacenters, they need to accelerate the building of new datacenters in new geographies, and they need to take greater advantage of advanced, sophisticated datacenters designed, built, and operated by service providers. IDC terms this business and datacenter transformation the shift to the 3rd Platform.
Tags : 
    
Cisco
Published By: Cray     Published Date: Apr 08, 2014
Recent IDC surveys of the worldwide high performance computing (HPC) market consistently show that cooling today's larger, denser HPC systems has become a top challenge for datacenter managers. The surveys reveal a notable trend toward liquid cooling systems, and warm water cooling has emerged as an effective alternative to chilled liquid cooling.
Tags : 
cray, hpc, high performance computing, hpc, power and cooling, cooling, warm water cooling
    
Cray
Published By: Epicor     Published Date: Nov 02, 2015
While a manufacturing execution system (MES) is often viewed as “just” a tool for helping the “shop people” go about their day-to-day tasks, the fact is that such a system also has more than ample potential to help transform the shop floor into a business center of excellence, and propel the company forward as it targets market leadership. Performance efficiencies gained with MES can open up the possibility of increasing output and profitability, all with existing production assets. MES can offer a quick, hassle-free way to turn shop floor operations into a corporate center of excellence.
Tags : 
mes, statistical process control, statistical quality control, manufacturing, technology, manufacturing operations
    
Epicor
Published By: RF Code     Published Date: Sep 03, 2014
A conversation in 2011 between Joel Stone, Vice President of CenturyLink’s Global Data Center Operations and John Alaimo, CenturyLink Data Center Systems Engineer, raised an interesting question: ‘How can we lower the amount we are spending on powering and cooling our data centers?’ Click here to find out how.
Tags : 
rf code, power and cooling, data center, it spending, energy, energy spending
    
RF Code
Start   Previous    1 2 3 4 5 6 7 8 9 10 11    Next    End
Search      
Already a subscriber? Log in here
Please note you must now log in with your email address and password.